admin

Aug 192014
 

new sheetrock new sheetrock 2

It’s all beginning to come back together!
Work is progressing at a quick pace.
Keep checking for pictures and updates.

 Posted by at 7:42 pm
Aug 192014
 

childrens room

This is a neat view from the reading room into the side Children’s room during the removal of the paneling.
The paneling is removed from the front room but is still hanging in the back room.
You can see the original layers of  lathe and board that existed under the paneling.
Also, the original wood floor can be seen.

 

 

 

 Posted by at 7:39 pm
Aug 192014
 

beams

The demolition made it possible to put in new supports to strengthen the ceiling and floor.

The yellow beams are the new super-strong supports. They were sistered in along side the original beams to make these areas stronger.

 Posted by at 7:35 pm
Aug 192014
 

This is what the inside of the library looked like…

The ceilings and floor were taken out resulting in piles of rubble for the dumpster.

back entrance

 Posted by at 7:32 pm
Jul 022014
 

4th of July Weekend: In honor of July 4 the library will be closed Friday, July 4, Saturday, July 5 and Sunday, July 6. Have a happy and safe holiday weekend!

 Posted by at 7:07 pm
Jun 272014
 

Don’t forget tomorrow (Saturday June 28) is the Friends of the Boonton Holmes Library Lemonade Stand/Bake Sale and Summer Reading sign up….10am-3pm. See you there

 Posted by at 8:00 pm
Jun 172014
 

side view

Work is in full swing at 621 Main Street! This is a view of the Church Street side entrance. It seems the book drop is blocked, so any materials in there will be retrieved as soon as possible and resulting fines will be adjusted accordingly.

 

 Posted by at 3:11 pm